Jan 2004 to Present
Swanson Rink, Denver, CO, Audio/Video
Design Specialist
Dec 2000 to Dec 2003
Encoda Systems Inc. Denver, CO, Project
manager (Systems group) Encoda Systems is the new name
that was chosen for the group of companies principally comprising §
I returned to what was really the same company (Drake Automation
Ltd.) on the offer of a significantly improved job position at the § Responsibilities were much as before but at a higher level. § During 2001 completed projects included:-
There was a need within the
company to strengthen the §
Based at Encoda in · Management of US based automation projects including resource planning, timescale planning, technical liaison, issues management. ·
Management of · Inside Sales activity including pricing, proposal drawings and liaison with the various points of expertise in the company and station engineers of new and existing customers to ensure all sales proposals were technically feasible and appropriate to the intended purpose. · Liaison with station engineers, chief engineers, VPs of engineering etc. to capture requirements correctly both for upgrades and to identify potential new business. · Installation and maintenance of the automation test and demonstration lab. This is a fully featured flexible multi-channel demonstration system built to broadcast standards. · Automation systems planning, procurement, engineering and coordination for exhibitions and customer on-site demonstration systems. · A single point of expertise for all CAD based drawing and design requirements. · Technical liaison with US based system integrators.
Feb 2000 – Dec 2000
Sony Broadcast & Professional Project
Leader (systems production) Sony Broadcast and Professional § As a Project Leader my responsibilities covered project planning management, design, supervision, commissioning, customer liaison and proposals at a senior level. I was “headhunted for this position” by Sony in an effort to strengthen the capabilities of the Systems Production Management team. During my time with Sony completed projects included:- ·
Automated transmission playout system for TV Norge based in ·
Large Scale NewsBase system for Nord Deutsche RundFunk based in ·
Medium sized Newsbase system for Deutsche Welle based in · Completed proposals for 6 camera Outside Broadcast Trucks for Egyptian Media City Project. Jan 1994 – Jan 2000
Drake Automation Ltd. Project Engineer (systems group) §
Drake Automation (formerly Philip Drake Electronics based in
Welwyn Garden City, Hertfordshire, UK) specialises in Multi Channel broadcast
automation and related products. The company was historically a full capability § My responsibilities included project planning, management, design, supervision, commissioning, customer liaison and proposals. · Projects completed between 1994 and 2000 include:- ·
Euroradio Automated Control Room for EBU (European broadcasting ·
Radio Studios and misc. facilities for European Parliament Press
Centre, ·
Single camera contribution facility for AA Roadwatch, Stanmore, ·
Transmission control centre for 2nd channel, ·
Automated transmission area, compilation facilities and component
edit suite for HBO, ·
160 channel Network Monitoring and Control Centre including
comprehensive TVRO satellite receive dish system for Telepiu, ·
New automated transmission facilities including multi-channel
control rooms and network control areas for BskyB, Osterley, ·
Lines area facilities and satellite receive monitoring and
backhaul systems including a major TVRO dish installation as part of entire
ground up automated multi-channel television facility for WizjaTV (thematic
channels for ·
Over-air command and network protection system for NDS, Hedge End,
Southampton · Automated transmission facilities for UPC, Amsterdam, Netherlands A large complete new build from scratch facility which includes automated playout and ingest systems, large scale material archiving (StorageTek and Avalon), edit suites (Avid and traditional GVG based), audio suites and multi-format areas.
June 1990 – Dec 1993
British Aerospace, Plc. Warton, Defensive Aids Trials Engineer § Worked in Military Aircraft Division, mainly involved with Tornado Interdictor Strike aircraft mid life update programme. § Responsibilities included rig design, testing and organisation of ground and airborne trials programmes for new defensive aids receive and radar jamming sub-systems. § Also had responsibilities for Radiological Hazard assessments for ground and airborne radar and related systems. · Extra-curricular activities during this period included:- ·
Design, installation and commissioning of 2 radio reporter
vehicles for British Broadcasting Corporation, ·
Performance of occasional radio outside broadcast operation and
recordings for British Broadcasting Corporation, North-West §
Consultation, proposals and research for 2 radio licence
applicants. One in North-West
Sept 1982 – June 1990
British Broadcasting Corporation Radio
Radio Engineer in various areas. § September 1982 to January 1985 shift maintenance engineer in all central London BBC radio areas at various times. Included the full range of installations from recording studios to main control room systems. Included, within the first year, training to full BBC ETSIs standard. Note ETSIs (Engineering Training Standing Instructions) are the required BBC internal qualifications required for all BBC engineering staff – involves a total of 3 months full time education and success in course work and final exams). British Broadcasting Corporation (continued) § February 1985 to June 1985 technical commissioning engineer. Full commissioning and “sorting out” of new studio installations to acceptance standard for service.
Educational Background Sept 1972 – June 1977
General Certificate of Secondary Education- Passes in 7 subjects. Sept
1978 – June 1982
Bolton Institute of Technology , Bolton
, Greater § Ordinary Diploma in Electronic and Electrical Engineering § Higher Diploma in Electronic and Electrical Engineering.
|
|
Send mail to tony@bottomlinetech.com with
questions or comments about this web site.
|